[1]
Chkolyan, K. 2025. Application of Basalt Fibers and Cement Through FDR Technology in the km 93+880 Section of the M2 Yerevan–Goris–Meghri Highway . Journal of Architectural and Engineering Research. 9, (Oct. 2025), 34–41. DOI:https://doi.org/10.54338/27382656-2025.9-03.